September 20, 2025,: Official khan laga ekta team, Deputy Commissioner Kohima, B. Henok Buchem para lead kuri kena, ekta joint inspection conduct kurishey, NH-29 laga, kuntu toh hoiley Kohima aru Phek district ke connect kurey, itu opor tey inspect kurishey, 19th September, 2025 tey.
Itu inspection team toh tey included Revenue Officer Kohima Kevingoto Kulnu, Extra Assistant Commissioner Kezocha Limakumla Pongener, Executive Engineer aru PHED Rural Kohima laga SDO, DDMO Kohima (NSDMA), NHIDCL laga representative khan, itu EPC contractor, aru alag concerned official khan thakishey, koishey.
Itu inspection laga homoi tey, itu Deputy Commissioner para strong para khushi nathaka laga express kurishey aru deep concern thaka laga express kurishey, itu bishi para biya hoi thaka laga raasta laga condition opor tey, aru tai para itu contractor toh juldi para nakuria ke criticize kurishey, thik homoi tey maintenance aru repair khan kuriboley.
Itu NH-29 laga strategic importance emphasize kuri kena, ekta vital lifeline asey koi kena, itu Phek, Meluri, Zunheboto, aru Kiphire tey, tai khan ke itu Kohima laga state capital tey link kuri di kena, itu NHIDCL aru EPC contractor khan ke juldi para raasta restore kuriboley aru repair kuriboley laga kaam khan initiate kuriboley koishey.
Itu inspection team para multiple critical location khan tey visit kurishey, itu sinking zone khan bhi milai kena, KM 22+536 aru KM 22+834 tey, aru itu damage hoi kena thaka bridge bhi milai kena, KM 23+665 tey.
Itu contractor ke safety measure khan thik thak para implement kuriboley direct kurishey, aru bhi raasta biya hoi thaka ke rukhaboley karney, landslide hoi kena thaka letra khn phat para safa kuriboley aru NH-29 tey pavement khan damage hoi kena thaka resurface kuriboley.
Itu contractor para itu official khan ke safety measure khan assure kurishey, itu sinking site tey, kuntu toh hoiley October 3rd tak tey, dhali diboley asey.










Add Comment