Regional

Assam | NHPC khan Lower Subansiri project laga kaam shuru kuribole ase

Guwahati | Aug 24. 2019 (IANS): State-owned NHPC khan  2,000 MW Lower Subansiri Hydro Power Project Arunachal Pradesh te paani gira season khotom kurikena bonabole shuru kuribole ase .

Assam government aro  NHPC Limited  Friday din  te etu project shuru kuribole nimete Memorandum of Agreement (MoA) sign kura pichede janaishe .

Niraj Verma, Principal Secretary (Power) para state government khan laga behalf aro  Balraj Joshi, CMD, NHPC laga behalf  etu   MoA sign kurishe .

Etu megas power project laga kaam shuru kura toh  2011 para kurishe etu bi   Assam laga alag alag organization khan para  agitation kuri thaka time te  .Organisation khan para khilaaf kuri thakishe etu dam bona nimete etu bi  Assam toh  seismic zone V te thaka nimete aro judi chamela olaishe koile toh    etu para dikdaar  dibo downstream states khan ke .

Alag alag committees khan etu project laga uporte kotha kurikena remedial measure uporte kotha kurikena   technical apprehensions khan saiase aro legal   hurdles khan hataidishe .

Subansiri Lower toh sobse dangor  hydro project ase etia bonai ase  installed capacity 2,000 MW aro  annual generation 7,421.59 MU te aro etu toh  Assam aro  Arunachal Pradesh border te ase.

NHPC koishe etu cascade development nimete thaka karne aro Brahmaputra Board, para ola nimete .Etu project  para flood relief Subansiri river laga flow komti kuridibo.

NHPC para  protection works khan  loishe Subansiri river laga downstream area te flood water komti kuribole aro soil erosion sabole nimete ase.