Regional

Assam: Electric buses Guwahati raasta te

GUWAHATI | June 11, 2019:Pollution komti kuribole nimete Assam State Transport Corporation (ASTC) khan para 15 electric buses government’s FAME (Faster Adoption and Manufacturing of Electric vehicles) scheme bithor te shuru kuribo.

Etu buses khan laga trial run toh  June 22 para shuru kuribole bhabana kuri ase .Ekta Bus te  31 passengers laga capcity thakibo.

“Ami khan logote  15 electric buses ase.Etu toh central government  initiative ase .Etu bus khan toh trial run huwa pichede shuru kuribo,” Chief Engineer Balidan Das koikena janaishe.

Etu buses khan toh  ASTC Kachari-Kamakhya route para kuribo  etu para ek din te five to six trips nishena hobo.Aro kunba bus khan toh   duita alag alag route  ISBT aro Paltan Bazar para  chulabole ase.

“Government of India khan kosish kuri ase  joldi hi emission free transport anibole nimete .Aro bus khan toh etu moina para shuru kuribo etu toh emission free thakibo.Etu phase operation toh  Kamakhya temple para shuru kuribo,” Anand Prakash Tiwari, Managing Director (MD) para koikena janaishe.

ASTC khan para tinta route olaishe  etu buses khan chulabole nimete .Etu laga akhe route toh  Kachari para Kamakhya tak thakibo  6.4km distance cover kurikena  ,second route toh Paltan Bazar para airport tak  2.5 km distance cover kurikena aro third wala route toh    ISBT, Khanapara, Ganeshguri, Paltan Bazar, Maligaon aro IST te wapas ahibo  38 kms distance cover kurikena .